On the Critical Path
On the Critical Path

On the Critical Path

0.0(0 votes)
1971
0h 22m
Documentary

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Production

ONF | NFB

More Like This

Nuclear Now
Elektro-Lähmung - Ein Film gegen die politische Ohnmacht
On Power Refuelling
Radioactive: The Women of Three Mile Island
Developing Tomorrow’s Energy
The Atom: A Love Affair
Sista varningen!
The Battle of Chernobyl
Atomic: Living in Dread and Promise
We Are the Guinea Pigs
The Nuclear Frontier
Voices from Chernobyl